SMC’s

Focus Partial Discharge


Prime-600-recortado

Prime 600 Dynamic Micro Ohmmeter

**Sealed Circuit Breaker Condition Analysis**

[ Prime 600 Dynamic Micro Ohmmeter ]
• Dynamic Resistance Measurement
• Dual ground operation
• Automatic de-magnetization function
• Alert on connection mistakes
• Touch-sensitive graphical display
• Pre-defined test modes
• Built-in thermal printer
• Removable USB storage
• PC download and reporting
• Sturdy, water proof ABS casing, IP67
• Temperature normalization


RAPTOR22

RAPTOR

**SUBSTATION TEST SOULUTION**

[ RAPTOR ]
Multi-functional Primary Testing System
– Primary current injection testing.
– Relay testing.
– Switchgear Testing.
– Current Transformer testing.
– Recloser and Sectionalizers.
– Heat runs.
– Ground Grid testing.
– up to 15,000A (New Series up to 20,000A).
– Automatic Output regulation.               – Multi-Functionality.
– Expandability.           – Spire-through concept.
– Powerful measurement capabilities.        – Low weight and Size.


**Newly
High AC voltage up to 2,000 V can be accomplished by adding
the Raptor HV to the system.These jobs include power transformer evaluation,voltage withstand / isolation tests,and step & touch voltage measurement,among others.


RAPTOR_HV_07

RAPTOR HV

**SUBSTATION TEST SOULUTION**

[ RAPTOR HV ]
High Voltage Option for the Raptor System
– CT, VT and PT withstand voltage tests
– CT and VT excitation current measurement.
– VT and PT ratio measurement.
– Polarity test in VT’s secondary winding.
– Step & Touch Voltage Measurement
– Testing voltage sensors and converters.


smc07

PME-500-TR

**Circuit breaker analyzer**


[ PME-500-TR ]

– Open-& Close-time measurement in main and auxiliary contacts.
– Graphical and numerical evaluation of coil currents.
– Three-phase, 4-wire measurement of contact resistance.
– Substation’s auxiliary DC supply condition evaluation.
– 5 time measurement inputs.
– Programmable test sequences: C, O, C-O, O-C, C-O-C, O-C-O
– Pure DC injection for contact resistance measurement.
– Test sequence can also be triggered remotely.


smc05

PTE-100-C

**Single phase Current and Voltage Relay testing unit to 250A**


[ PTE-100-C ]

– Testing of overcurrent and minimum/maximum voltage relays.
– Testing of overcurrent directional relays (option PTE-FCL).
– Testing of reclosing devices (option PTE-FCE).
– Testing of dc relays. – Testing of MCB’s.
– Verification of the knee point in current transformers.
– Combined with the PTE-100-V,
– Forms a complete single phase system,
– capable to test differencial, synchronized, and inverse power relays.


스크린샷 2014-06-12 오후 12.34.26

MENTOR 12

** RELAY TEST SOLUTIONS **


[ MENTOR 12 ]

Universal Three-phase Protective Relay Test Set
– 3 voltage + 3 current outputs, switchable to 6 current outputs.
– User-upgradeable up to 12 outputs 2complete 3
– phase systems – 12 binary inputs + 8 binary outputs
– Auxiliary 0 – 250 VDC source to power the tested relay
– DC current and voltage measurement input
– 12 low-level outputs to test sensors, meters etc,
– Super-imposed harmonics – Output channel grouping


smc06

PME-100

** Digital Micro Ohmmeter up to 100A **


[ PME-100 ]

– Measures the contact resistance of circuit breakers,
motor and transformer windings.
– Measures the power drop when current is injected
in an unknown resistance.
– Measurement is by 4 wires to eliminate the resistance
contact and measurement cables.


smc02

LET-400-RD

** Primary Current Injection Test Set **


[ LET-400-RD ]

– Test of the I/T curve in primary current relays test.
– Primary injection tests.
– Test of measurement and protection transformers.
– In general, primary injection tests including the complete loop,
such as current transformer cables, protective relays,
and circuit breakers.


smc03

LET-1000-RD

** Primary Current Injection Test Set **


[ LET-1000-RD ]

– Direct and motor overload relay test.
– In general, primary tests including the complete loop
– Permanent current up to 1000 A, 2 KVA in 3 Ranges.
– Built in digital ammeter 0.5% accuracy.
– Built in digital timer resolution 1 ms.
– Thermal and shortcircuit protection

smc08

GOOSEMeter One

GOOSEMeter One IEC-61850 Traffic Analyzer

– Real-time inspection of IEC-61850 dataset lifecycle
– GOOSE message contents analysis
– Substation’s twisted-pair cabling verification


ETP Series

ETP Series

ETP Series

ETP-1 : Three-Phase transformer turn ratio measurement
ETP-2 : Recovery Voltage and Insulation Measurement
ETP-3 : Three-Phase Winding resistance Meter
ETP-4 : Three Phase Short circuit impedance
and short circuit voltage meter
ETP System : Test system for predictive maintenance
in power transformers